Beaver Dam Removal
In the event that a beaver dam on Levee Board right-of-way has backed water against the levee structure, the Mississippi Levee Board utilizes explosives to remove the beaver dam and alleviate ponded water.
In the event that a beaver dam on Levee Board right-of-way has backed water against the levee structure, the Mississippi Levee Board utilizes explosives to remove the beaver dam and alleviate ponded water.